在线激情 I 激情va I 亚洲欧美洲成人一区二区三区 I 涩涩网站视频 I 亚洲在线视频一区 I 国产乱码二卡3卡四卡 I 91插插插插 I 亚洲图片另类图片激情动图 I 国产欧美亚洲精品a第一页 I 国产嫩草影院在线观看88 I 伊人网在线免费 I 免费高清一区二区三区 I 999在线视频精品免费播放观看 I 精品美女在线 I 国产欧美在线一区 I 国产女人av在线 I 91观看视频 I 丁香婷婷深爱五月亚洲综合 I 欧美一区一区 I 国产69页 I 玖玖在线观看 I 亚洲片免费看 I 女人国产香蕉久久精品 I 一区二区成人在线 I 欧洲性久久精品 I 午夜神器在线观看 I 美色综合 I 在线观看免费人成视频网 I 日韩色网址 I 乱精品一区字幕二区 I 免费污片软件 I 中文字幕一区二区三三 I 亚洲福利国产精品 I 69日小视频在线观看 I 亚洲高清不卡在线

Reactor Technology

24-Hour Service Hotline

+86-13606176623
HomeNews

Leak test of stainless steel reactor

Date:2021-06-16Source:Views:

Water filling leak test procedure of stainless steel reactor


① Before water filling test, all accessories and other components welded with stainless steel reactor body shall be completed.


② Before water filling test, all welds related to tightness test shall not be painted.


③ Fresh water shall be used for water filling test, and the water temperature shall not be lower than 5 ℃. For stainless steel reactor, the chloride ion content in water shall not exceed 25mg / L, and the water for aluminum floating roof test shall not have corrosive effect on aluminum.


④ 0.1-0.2mpa compressed air shall be injected into the reinforcing ring before water filling test for weld leakage detection.


⑤ In the water filling test, the observation of foundation settlement should be strengthened. In the water filling test, if the foundation settlement is not allowed, the water filling should be stopped and the test can be continued after treatment.


⑥ During the process of water filling and discharging, the breathing valve port shall be opened, and the foundation shall not be soaked. The water filling height shall be the highest operating liquid level. When the strength of stainless steel storage reactor is tested, the liquid level shall be maintained for 48h, and the stainless steel reactor wall shall be observed to be qualified without leakage and abnormal deformation. If any leakage is found, water shall be drained. Before draining, mark and make the liquid level about 300 mm lower than the leakage point, and then carry out repair welding.


⑦ During the strength and tightness test of the stainless steel reactor top, the water level in the stainless steel reactor should be LM below the maximum liquid level, and the pressure should be increased slowly. When it is increased to the test pressure (1.1 times of the designed internal pressure), it is qualified to observe that there is no abnormal deformation in the top pouring and no leakage in the weld (soapy water). The stability test of the stainless steel reactor top should be filled with water to the designed maximum liquid level, The water discharge method is used. During the test, the pressure should be lowered slowly. When the test negative pressure is reached, the stainless steel reactor top is qualified if there is no abnormal deformation. After the above two tests, the stainless steel reactor should be connected with the atmosphere immediately, and return to normal pressure. In the weather that causes drastic temperature changes, it is not suitable to do the strength, tightness and stability test of the fixed top.


Wuxi Municipal sea Petrochemical Equipment Co., Ltd. is a professional manufacturer of chemical and pharmaceutical equipment. The company has strong technical force, complete equipment, advanced production technology, perfect detection means, reliable quality and superior performance.


A professional factory that manufactures chemical and pharmaceutical equipment, a comprehensive enterprise integrating R&D, production and service

Technical Support:YOUWEI

Tel:+86-13606176623

Add:East of yuanhu road, wutang community, Xue lang street,Binhu District, Wuxi City, Jiangsu Province (inside gongming machinery)

Email:cnrq@cnrq.com